The stainless steel profile should be wiped clean of any light
surface grease/oil before installation. Stainless steel is an extremely
durable hard wearing material. The profile has a factory finish
(no polishing or brushing has been applied) and general machine
marking , light scratches on the products surface is normal.
1. Complete tiling
around window or one side of a corner first. |
2. Measure length
required and mitre trim as necessary. Stainless steel is a very
hard metal, use a new very fine blade in your hacksaw and hold the
profile securely whilst cutting.
|
3.
Apply tile adhesive.
|
4. Place tile edging
in adhesive ensuring tile adhesive comes through holes provided.
|
5.
Place tiles on to adhesive butting up against trim edge.
6. Take time to ensure
tiles are flush with edge of the trim, pack up with extra adhesive
if required.
|
7. Take care to wash
off excess adhesive whilst still wet. Set adhesive is very difficult
to remove.
|
8. Grout tiles in
the normal way again making sure all excess grout is removed whilst
still wet.
|
9. Allow adhesive
and grout to dry thoroughly before normal use.
Please note. The above information is offered
as a guide only, please consult your tile supplier for full fixing
and grouting instructions for the tile you have chosen. |